Our 1935 Bungalow remodel, with a Kitchen Remodel, Electrical, Plumbing, Central heat & air, quartz counter tops, refrigerator, oven, sink, fixtures, and more built in 1935. Our craftsman, handy man special.
Tuesday, January 20, 2009
New Window
Monday, January 19, 2009
The shower fiasco
The plumber had to knock out a bunch of tiles to install the new water lines. So, I decided finish the job and just take out the one wall of tile. I'm not exaggerating when I say these guys had about an inch and a half of plaster or concrete masonry or whatever they used on showers 1935.
I tried to save whatever tile I could, because I knew we would never be able to match this mint green tile. So the idea was to save some and work it in to make the tile job seem cohesive.
Originally I was going to go with a black and green classic art deco type design as shown below:
But it would have taken too long to remove all of the mortar and grout from all of the old tiles. So we decided to go with something simpler and easier.(by the bye, if you're doing any remodeling and you want to plan things out visually and spatially, use google sketch up. It's easy, it's free, and there is a warehouse full of things already made that you can use in your sketches...i.e. ovens, drawer handles, etc.)
more on this fiasco to come...gute nacht.
Thursday, January 15, 2009
Plumbing the depths
I guess with so much going on at the house i'm going to "take a bath" here and there. (pun intended)
We had a little leak where one of the toilet water line meets the floor, so they came out to fix it, after they left, the electrician there was a leak in the toilet line. I said, I know. He said no, this other toilet. It's ok they're coming back to hook up the fridge any way right? He wanted me to build a wall behind the fridge where he can put a valve for the fridge. Luckily, this was included in the original quote price.
More plumbing pics below...
The plumbers box o parts
Our new hole for the fridge, we pushed it back in the wall so it will be even with the 24" cabinets
New water service line.
Tuesday, January 6, 2009
Free Dust!
The grinding down of these four cinder blocks created all that dust you see surrounding it. Andy was the angle grinder man. Down on his knees, hunched over laboriously cutting them down to floor level. I now have the duty of taking a wet rag to the whole house after sweeping. Dusting is just out of the question because it ground down to the same consistency as baby powder!
Monday, January 5, 2009
a day in the hole...
Below are some pics of damage and the installed beam:
Friday, January 2, 2009
Air Conditioning
With the new
unit in the attic and all of the duct work it has become very difficult to move around now. I was going to replace all of the loose fill insulation, but the lack of space to work is very discouraging. I guess if we didn't want to move into the house asap, I would have scheduled things differently.
Thursday, January 1, 2009
Lectricity
We are about 85% on our electrical update. The Electrician spent about 2 days completely rewiring the house. Now I need to get our new wall put up in the kitchen so he can wire that wall and finish the job. We are going from the very old "knob and tube" wiring:

To the new standard Romex:

I'm really gonna miss these old fixtures:
and a bucket 'o' switches and such:

Gravy had a ruff day too (no pun intended)
To the new standard Romex:
I'm really gonna miss these old fixtures:
Gravy had a ruff day too (no pun intended)